Control
GlossaryRisk
A check on how an evaluation is done, which a policy sets, such as "measurements use a Class 1 meter".
Not
Not a mitigation: a barrier is a Structure, and a site's own limit is a criterion of its Permit.
The Control schema defines it. The whole glossary has every term.